50tons coal fired chain grate steam boiler for rice mills
Calculated gas 50tons coal fired chain grate steam boiler for rice mills plant to explain your boiler heating area: Gas-fired steam boiler plant to you to explain the calculation method of gas steam boiler heating area of the boiler, which is sure to install emissions-line monitoring devices, and, should environmental protection department of the monitoring center networking, so the job. And this kind of boiler heating area, specifically, then, is to be determined according to the location of the boiler, its usage and requirements. Generally speaking, if it is 1 ton, then, it is about 7000 square meters of heating area. 4 tons of gas steam boiler, which uses induced draft fan, then, that in the selection and configuration, generally speaking, if a different motor, then, there is a different choice, but specifically, then, is there are two First, Y5-47-6C, power is 15KW / 18.5kw, grade 2 is a motor; Second Y6-41-7.1C, power is 15kw / 18.5kw, the motor is four. 10 tons of gas steam boiler, between it and the workshop is to have a safe distance, and can not be a piece design, it must be independent. Therefore, it is generally to be more than 5 meters, so the job, however, can also be separated coal field.
Exhaust gas has been plagued by sewage paper industry, paper industry pollution problems of the country very seriously. Fujian Heng paper packaging company has been committed to the use of clean-type boiler paper processing. October 22, 2016, David Carse, the paper with my company, signed a 6 tons of steam an integral condensing 50tons coal fired chain grate steam boiler for rice mills for the production of corrugated cardboard and other paper products. I provided the boiler greatly solve the problem of sewage wastewater Heng paper. After the boiler operation, both to meet local environmental requirements, but also reduce operating costs for the constant boiler paper products.
Gas-fired 50tons coal fired chain grate steam boiler for rice mills, gas steam boiler buy several natural gas boiler should pay attention to, the purchase of natural gas boilers points to note from the National Development and Reform Commission learned that China's coal to gas steam boiler is widespread promotion of the implementation, will enter a stage of comprehensive reform. Xinjiang is about to be the most important work to complete the rectification, the rectification process of the Central Plains and northern regions also increased the intensity and speed of more than 40% of the coal-fired steam boilers, gas-fired completed the replacement of the country. At this stage there are a lot of users need to buy gas-fired boilers to meet the current national environmental policy, I would buy natural gas boiler problems and the majority of users to exchange views in order to buy the rest assured, with satisfaction. First and foremost do with the current coal-fired steam boiler model number and tonnage, boiler gas production and steam pressure that is being used enough, if we can current production, gas production and pressure on the election of equal size gas steam boiler, if not enough or barely enough, you need to choose a slightly larger model of boiler is the second point you are ready or the near future to expand the scale of production, it is necessary to recalculate gas production gas steam boiler, steam boiler of the gas production and future production scale be able to adapt. I met a lot of friends only consider the current, do not consider the needs of the next few years, thinking only meet the current needs on the line, such as the expansion of production and back. The ideas and practices to create a lot of trouble later, the life of a gas steam boiler is probably about 15, you do not have to change a few years, it is only used when processing a lot of losses. Furthermore, the replacement process is very time-consuming, to re-install the application procedures go again, and delayed production. Do not take precautions, you will regret it. The last thing to note is to ensure that the opening of the gas pipeline, if your area has no natural gas pipeline, is to buy a gas steam boiler also spend the. In determining the purchase of gas-fired, the first not to rush to the boiler transported to the site, first opened gas pipeline things well. A client told me: "I opened a mouth, a natural gas company gave me to do 100,000 a month just to run." So, first hit the point about the relationship, try to spend less money to natural gas mouth opened, then natural gas boiler shipped home.
About six tons of 50tons coal fired chain grate steam boiler for rice mills shutdown of a temporary shutdown: It is planned, therefore slow cooling during shutdown protection device, it should also pay attention to safety, pause furnace according to the rules in Chapter IV Fenghuo (pressure fire) get on. 2, safety shutdown: care should be completely stopped even on normal operation plan for 1 to 3 months to be a shutdown, shutdown should maintain more safety injection apparatus, after the shutdown, and other water-cooled furnace to below 70 ℃ when they let go of the gas, open manholes, hand holes, rinse the pot with water scale. 3, emergency shutdown: the boiler operation, when the case of the following circumstances, should an emergency shutdown, and notify the relevant authorities. (1) expanding the cease-fire should first see if the water table level is called to take water law. If Inception water table, water cock side, and then close the steam cock, and then turn on the water faucet open and close repeatedly called after water, still can not see the water. (2) All water supply equipment failure. (3) All water gauge, pressure gauge, safety one of all the failures. (4) a boiler or furnace wall element damage, serious threat to the safe operation of the boiler, emergency shutdown, should focus on preventing the stop of the accident and the specific steps as follows: ① first blowing off; ② the coal on the grate red raking; ③ Close induced draft fan.