Ironing Table With Steam Generator Boiler
Secondly, if your boiler is electric steam boilers, the installation should pay attention to the ground as it relates to the use of safety later. In order to secure the ground wire installation, a ground line nearby and piling a depth greater than or equal to 1 m 5, the cable connector ground should be sintered at a ground pile head. Moisture to prevent rust should be higher than the ground connecting linker 100mm is appropriate. Boiler exhaust chimney to be discharged toward the outside should be, and should be higher than at the outlet of the boiler Di from 1.5 to 2 m. Ask your local branch overhaul of special equipment installed after the declaration. Acceptance by the relevant part of the consent to the use, and receive a use permit before using the boiler. 30L or less than the vapor pressure of the ironing table with steam generator boiler volume is less than 0.1MPa fall within the scope of the national exemption, ie no need for boiler use permits can be used.
About boiler, daily attention to ten o'clock analysis of its original meaning, it means the pot is heated in a water container on the fire place burning stove refers to fuel the boiler including the two most from the pot and stove included. Today, we say that the boiler is the use of fuel or other energy hot water heating can become mechanical equipment of hot water or steam. Generating hot water or steam boiler may provide heat directly to the required industrial production and the people's living, the steam power plant can also be converted into mechanical energy by the generator can convert the mechanical energy into electrical energy. Because the frequency of use of the boiler is high, so it's for routine repairs and maintenance is also very important, here are ten aspects regarding boiler need attention, we divided into two parts to illustrate: First, note the boiler: (1) boiler factory, should be accompanied by quality certification, safety instructions and other supporting information. (2) boiler installation, maintenance and renovation should be obtained qualifications in this area for the job, not blindly, to avoid problems. (3) boiler to be registered before the registration can be used, and to be performed by professional job. (4) the operator while operating the boiler, and eight systems should abide by the rules and six records. (5) boiler and its safety accessories to be tested on a regular basis, no test can not be used. Second, boiler routine maintenance: (1) Check the boiler pressure gauge, water gauge, safety valve, sewage plant, the steam supply valve and the valve and verify its compliance with the performance requirements. (2) Check the automatic control device system meets the requirements. (3) Check the boiler feedwater system meets the requirements. (4) on the blower, induced draft fan, damper, etc., to see if intact, is working. (5) boiler should be regularly checked once a problem is found to be in time, so as not to affect the normal operation.
Beiqi Panther car 6 tons of steam condensing one fuel gas steam boiler project has been successfully completed. This series boiler adopt advanced design concepts, using the waste heat of flue gas cascade, with the use of the condenser and the economizer fully absorb the waste heat in the flue gas, the boiler efficiency has been greatly improved.
Relationship between generator capacity and boiler capacity
From the energy point of view, the power generation process of the power plant is essentially a process of energy conversion (chemical energy → thermal energy → kinetic energy → electrical energy).