horizontal oil or gas fired steam generator
Opening the water supply valve motor, regenerative electric closing valve, a pressure pump to start the cycle frequency control constant voltage supply, electric boiler starts after about 30 seconds, in such a manner direct supply water to the user. At the end of the water supply, stop circulating pressure pump, electric boiler stops after 60 seconds. When the water reaches the time period, the electric power boiler feed water valve is open, regenerative electric valve is closed, the electric boiler is not working, the circulation pump frequency control water supply pressure. Electric power supply period of boiler feed water valve has been closed, not to pay it to avoid the cold water supply to the user. If the heat storage tank and the temperature is below the set temperature in the regenerator period of 5 ° C, pressure circulation pump into operation again, electric boiler start working after 30 seconds.
Boiler Overview: boiler is an energy conversion device, the energy input to the boiler chemical energy, electrical energy, a boiler with a steam output of the fuel in the constant heat, high temperature water or organic heat carrier. The original meaning refers to the pot on the fire heated containers that hold water heater which places combustion of the fuel, boiler and furnace boiler consists of two parts. Generating hot water or steam boiler may directly provide the necessary heat for industrial production and the people's life, by a steam power plant can be converted into mechanical energy, or through the generator converts the mechanical energy to electrical energy. Provide hot water boiler hot water boiler is called, is mainly used for domestic, industrial production also have a small application. Boiler steam is known as steam boilers, often referred to as boiler, used for power plant, ships, locomotives, and industrial and mining enterprises. Gas boiler corrosion what issues need attention
Heating boilers partial failure of boiler pressure controller controls the generator, because there is no water showed no the control circuit board, which is mainly controlled by heating the liquid level control float. When an appropriate amount of water, floating on control splendidly floating-point voltage, so that the boiler applied AC contactor work, start heating. This simple structure generator, the current market use more circulation. Such a generator common fault is not heated, mostly appear on the float level controller. First check the external wiring float level controller, whether the control point of the vertical line connected pair, and then split the float level controller, to see if it floats flexible. Then you can use the manual, the heat upper and lower part of the fault can be turned on by the control point whether the amount of the multimeter. After checking everything is normal, then check whether the water tank float. In other words it can float, i.e. the fault is rectified.
Henan miss you Jujube Industry Development Co., Ltd. is mainly engaged in dates, nuts and other healthy food research and development, procurement, production and sales operations; jujube industry's first listed company. I miss you date industry is committed to providing health and hygiene products for people to date, in 2017, I miss you date industry decided to buy a few new clean and green, can provide high-quality steam boiler steam. Carefully selected is determined in cooperation with the fast boiler, signed two separate 10 tons of steam condensing gas steam boiler (WNS10-1.25-Y.Q).