At 10:00 on September 6 and more, Harbin, a business is the purchase of a new boiler equipment installation, commissioning process when staff at a boiler pressure gauge index found that the performance of the boiler abnormal, but not so the commissioning personnel when the next step, a sudden loud noise, boiler explosion, a huge flame and furnace pressure debugging of oil spray everywhere, four commissioning personnel are subject to varying degrees of injuries, was taken to hospital for treatment .

Boiler is an energy conversion device, by entering the fuel to the boiler, chemical energy, power, etc., outputs a constant steam heat, hot water or organic heat carrier, to provide support for the heat industries. Meanwhile, the boiler is also a special equipment has a certain risk, when the boiler installation, commissioning, operation, etc., be sure to boiler operation safety first.

Now, Xiao Bian to operational safety considerations gas boiler summarize, we can refer to.

First, start, boost, steam supply

1, before the start of the preparatory work

Internal and external check: Check boiler, burner, a good state of the accessory device; action safety accessories, each of the valves, such as flexible instruments, the correct position.

Check the line voltage to meet the requirements, a variety of normal switch position, respectively, various auxiliary pump starts operating, the burner fan, oil pump is normal.

Boiler Feed: exhaust valve opening, to ensure the normal water level (just below the water level).

2, start

Firstly purging the furnace, induced draft fan suction time is usually about 10 minutes to ensure that no residual gas in the furnace, passing substitutions, and ignition for combustion air supply.

After firing is completed according to the adjustment amount of load required for combustion, the boiler into normal operation.

During startup, to closely monitor changes in water level, water boiler accident or occurrence textile full of water accidents.

Second, the normal operation

1, the water level

Fuel gas-fired boiler water table should be the red line indicating the high, medium and low water level, the operation shall not exceed the maximum safe level or below the minimum safe level.

Rinse water table at least once per shift, when there is suspicion of running water, rinse should always check.

2, steam pressure

Red lines indicate the working pressure gauge should have, so sensitive and reliable, the trap should be flushed at least once a week.

3, safety valve

Safety valve should seal intact, no leakage; once a week manually (or automatically) emission test, and begin start pressure, opening pressure, reseating pressure and test time, participants, etc credited maintenance log book u, for future reference .

4, sewage

Proceed as boiler water quality requirements of water quality testing personnel under the guidance of class 1 or 2 times sewage, sewage incident not too long, generally no more than 10 minutes.

Sewage should (preferably when shutdown), should be closely monitored sewage water level changes, and pay attention to safety at the time of low load, low pressure, high water level.

Many boilers when sharing a sewage mains, while sewage is prohibited.

Third, shutdown

1, the normal shutdown

After normal boiler shutdown should generally be reduced boiler load operation, press the boiler shutdown procedure. Actuated pump water to high water level, pressure steam boiler to be dropped after 0.3MPa flushing water table and sewerage operations, and finally close the raft, cut off the power supply control cabinet, wipe equipment, clean up the environment and health, For water, the water temperature should be below after 70 ℃, before proceeding.

2, emergency shutdown

When the boiler operation in the following situations should immediately shutdown:

Furnace water level drops below the minimum water level gauge visible edges.

Increasing water supply and other measures, but digital still continue to fall.

Boiler water level exceeds the highest visible water table level (full of water), the water still can not see the water level.

All water supply system water pump failure or malfunction, not water to the boiler.

Water gauge or safety valve all the failures.

Endanger the boiler element is damaged and the safety of operating personnel.

Combustion equipment damage, or furnace wall collapse and other red-hot boiler structure is a serious threat to the safe operation of the boiler.

Other anomalies endanger the safe operation of the boiler.

3, maintenance

Before maintenance work should be well prepared, as before entering the drum interior work, must be of sufficient strength to connect all of the metal blocking plate spaced reliable steam, water, sewage and other operation of the boiler pipes, and the drum manholes and hand holes (boiler shell) is opened, so that air convection period.

After the completion of preparations to repair. Should ensure that the quarterly frequency of boiler maintenance and repair of the year.

Advances in technology to the boiler industry into new and innovative ideas, now the boiler manufacturers boiler are easy targets toward the operation forward, but in the use of the boiler, improper operation or other quality problems still exist, these failures will It is causing the direct cause of the explosion boilers. Therefore, when using the boiler must be in strict accordance with safety practices boiler, security incidents strangled in the cradle.

Check Item item 5mw hot water boiler coal districtheating hot water boiler comprising a boiler inspection and checking internal use preparations, checking in the furnace and the flue, the boiler attachment check, check automatic control system, the secondary device, check the combustion device, the auxiliary heat check the surface of the hot water boiler must be done before running some tests, these tests are quite a lot of us, it is possible because of our neglect and causing very serious consequences. Therefore, we must forestall, be sure to carefully check the following before the hot water boiler operation. 1, including the use of internal inspection and boiler ready. 2, inspection, and furnace fouling and debris inside the flue in the furnace and flue should be cleaned. Flue duct and damper, the shutter must be complete and compact, flexible switch, opening and closing accurately indicated. 3, check the boiler accessories, check the safety accessory is intact; cock is rotating flexible, easy to use; all kinds of instruments and controls should be complete, good, clean. After passing the examination, should the gauge cocks in working condition. 4, check the automatic control system. 5. Check the accessory device. 6, inspection of the combustion apparatus, the combustion apparatus is intact inspection; mechanical transmission system, coal handling system, the ballast system test switch normally; spring-loaded safety level of a gearbox should be appropriate, well lubricated; coal shutter indicate the correct scale. iron eagle neat, well, turn the ballast plates full, flexible movement. 7, the auxiliary heating surface of the inspection, check the auxiliary device (fan, blower, pump, etc.) are firmly connected coupling; proper belt tension triangle; oil should be good enough; cooling water flow. After passing the examination, installed security guard, respectively, commissioning, and note the current when idling. It is fed out of the hot water boiler heat equivalent to a mass per hour (usually expressed in tons) in water was heated from 20 ℃ and heat output of all vaporized into a steam boiler water absorbed three expressions, in tons) water from 20 ℃ heated and vaporized into all heat absorbed by the steam boiler it is fed out of the hot water heat equivalent to a mass per hour (i.e. typically kcal / hr (kcal / h), tonnes / hour (t / h ), megawatt (MW). (1) kcal / h is in metric units of expression, which represents the heat of hot water boiler fed out per hour. (2) t t borrowed steamed steam boiler popular argument, ( 3) megawatts (MW) is the international system of units unit of power, the basic unit is W (1MW = 106W). this expression formal documents should be used.

After World War II, the difference between oil-fired boiler oil-fired boiler and gas boiler, oil cheap, widely used in many countries have begun to oil-fired boiler. Automated oil-fired boilers easily improved. After the 1970s oil price increases, many countries once again turned to the use of coal resources. At this power plant boiler capacity is also growing, combustion apparatus requires not only complete combustion, ignition stable, reliable operation, good low-load performance, must also reduce pollutants in the exhaust. Or staged combustion using low temperature combustion technique, i.e. the delay coal mixed with air or air mixed with flue gas to slow down the combustion, the burner or dispersed to suppress coal furnace (especially lignite) in a power plant boiler temperature, not only can inhibit the generation of nitrogen oxides, but also to reduce slagging. Belongs to a fluidized bed combustion mode low-temperature combustion, ash content in addition to a very high combustible solid fuel, it may also be incorporated in the limestone for desulfurization ebullated bed. Gas boilers used to be a symbol of the industrial age, but with the passage of time, this old product of the industrial age has been difficult to fully meet the needs of modern enterprises, then the face of ailing businesses a boiler exactly how to solve it? Gas boiler can help you solve the problem! In general there are several common diseases boiler, environmental protection is not expensive, unsafe dangerous, need someone to manage a large floor space, the use of cumbersome need to apply for a variety of security documents. The use of gas water heater can all solve the above problem, first of all say that expensive is not environmentally friendly, gas-fired boiler uses a combustible gas, no pollution emissions. And is equipped with intelligent pressure control, do not worry about the risk of explosion or carbon dioxide poisoning. Because it is the use of high-tech, it is manufactured gas boiler small footprint, simple operation does not require someone to push a button all automatically.

About six tons of steam boiler shutdown of a temporary shutdown: It is planned, therefore slow cooling during shutdown protection device, it should also pay attention to safety, pause furnace according to the rules in Chapter IV Fenghuo (pressure fire) get on. 2, safety shutdown: care should be completely stopped even on normal operation plan for 1 to 3 months to be a shutdown, shutdown should maintain more safety injection apparatus, after the shutdown, and other water-cooled furnace to below 70 ℃ when they let go of the gas, open manholes, hand holes, rinse the pot with water scale. 3, emergency shutdown: the boiler operation, when the case of the following circumstances, should an emergency shutdown, and notify the relevant authorities. (1) expanding the cease-fire should first see if the water table level is called to take water law. If Inception water table, water cock side, and then close the steam cock, and then turn on the water faucet open and close repeatedly called after water, still can not see the water. (2) All water supply equipment failure. (3) All water gauge, pressure gauge, safety one of all the failures. (4) a boiler or furnace wall element damage, serious threat to the safe operation of the boiler, emergency shutdown, should focus on preventing the stop of the accident and the specific steps as follows: ① first blowing off; ② the coal on the grate red raking; ③ Close induced draft fan.

5Mw Hot Water Boiler Coal Districtheating Related Information

T-1543 - Yumpu.com

T-1543. micdeeco2. Views 67 per cent of districtheating was used within the service sector,while households accounted for about 22per cent and industry 11 per cent.The total installed electricity productioncapacity in Norway was 31,814 MW in2012. gasand coal for heating purposes.Emissions from fuel combustion fromthis sector contributed

T-1543 - Yumpu.com

T-1543. micdeeco2. Views 67 per cent of districtheating was used within the service sector,while households accounted for about 22per cent and industry 11 per cent.The total installed electricity productioncapacity in Norway was 31,814 MW in2012. gasand coal for heating purposes.Emissions from fuel combustion fromthis sector contributed

1t Gas Fired Steam Boiler Pressure 10kg -industrial

5Mw Hot Water Boiler Gas Districtheating; Oil Gas 2 Ton Horizontal Condensing Steam Boilers; 1000kg 2000kgs 4000kgs 6000kgs 10kg/M2 Pressure Wood or Coal Fired Water Boiler for Heating, Wood Boiler, Wood Fired Water Boiler manufacturer / supplier in China, offering 1000kg 2000kgs 4000kgs 6000kgs 10kg/M2 Pressure Fire Tube Boiler Price, "a

Biomass boiler services Ltd, 9 Silver Street, Berwick on

2020-5-19 · Boiler Services have been installing and maintaining industrial wood waste and biomass boiler equipment for over 20 years. We have worked on most of the leading European manufacturers equipment in locations throuhout the UK and Ireland. Boiler Services staff have undertaken manufacturers training in the UK, Germany, Denmark, Austria and the Netherlands.

2 mw industrial boiler manufacturer - De Vlietoevers

2mw biomass hot water boiler price CFBC Boiler Manufacturer. Jul 18, 2016 Hot water boilers are commonly used for hot water and heating supply in various applications. 2 MW biomass hot water boiler is almost a 3 ton boiler, used in ho. China Manufacturer Price Dzl 2.8-4.2MW Hot Water Boiler by Coal .

Biomass boiler services Ltd, 9 Silver Street, Berwick on

2020-5-19 · Boiler Services have been installing and maintaining industrial wood waste and biomass boiler equipment for over 20 years. We have worked on most of the leading European manufacturers equipment in locations throuhout the UK and Ireland. Boiler Services staff have undertaken manufacturers training in the UK, Germany, Denmark, Austria and the Netherlands.

T-1543 - Yumpu.com

T-1543. micdeeco2. Views 67 per cent of districtheating was used within the service sector,while households accounted for about 22per cent and industry 11 per cent.The total installed electricity productioncapacity in Norway was 31,814 MW in2012. gasand coal for heating purposes.Emissions from fuel combustion fromthis sector contributed

Biomass boiler services Ltd, 9 Silver Street, Berwick on

2020-5-19 · Boiler Services have been installing and maintaining industrial wood waste and biomass boiler equipment for over 20 years. We have worked on most of the leading European manufacturers equipment in locations throuhout the UK and Ireland. Boiler Services staff have undertaken manufacturers training in the UK, Germany, Denmark, Austria and the Netherlands.

Related Information