WNS Horizontal 3 ton Steam Generator
Boiler work principle in thermal power plant:Industrial boilers provide the steam needed during industrial production.Boiler generate high temperature and high pressure steam through the nozzle in turbine blades, the rotating blade and drive the generator rotor to rotate to generate electricity.
The contract is valued over €15 million and is set to be completed by the end of 2015. ZG will deliver one 135 MW steam turbine, with generator set and auxiliaries, including the water-cooled condenser for the coal-fired power plant.
Recently, the Weifang Municipal Quality Supervision Bureau investigation work for power plant boilers, boiler pipes mainly the situation, avoid boiler due to pipeline damage caused by explosion or other accident, serious economic losses and social impacts.
Quality Supervision Bureau adhere to problem-oriented, carefully study and strictly enforce the AQSIQ and the Provincial Quality Supervision Bureau of the requirements for the range of power plant boiler pipeline design, manufacture, installation, inspection, management and regular inspection of the use of accurate knowledge boiler safety awareness the importance of strengthening the red line awareness, risk awareness and responsibility to play, continue to maintain high pressure, strengthen safety supervision work of the power plant boiler tubes.
Bureau of Quality Supervision focus on checking whether the boiler tubes carry out regular inspections in the construction of power plant boiler accessories combination whether to implement supervisory inspection of manufacturing, installation work unit level meets standard requirements, flow meter housing if there is a security risk, whether the use of units developed power plant boiler tubes emergency plans and emergency rescue exercises, in a timely manner to improve the problems found.
To date, Weifang City inspectors were deployed 257 times, check the power station boiler unit 58, checking in with a number of boiler 193 units, eliminate safety hazards 78.
Steam boiler proper installation procedures, miss it, you will fall into the boiler installation is a lot of traps installed when you buy the real steam boiler suit your business, faced a primary. How to install the boiler correctly, ensure the normal operation of the boiler too late? Do not worry, we only produced high-quality fast boiler boiler, also has high Di service. On how to install the boiler correctly, we will send a professional and technical personnel to guide you. First, we must examine the installation environment of the boiler, boiler room layout should obtain prior consent of the local quality and technical supervision departments before construction, should be installed in the boiler room ventilation, cooling, flue gas emissions and easy place to facilitate the operation, not easy to close burning explosive materials, electrical installation should be invited by the relevant professional and technical staff to install the national scale, N and L lines must not be wrong. When using a gas as fuel should proof electrical installation means away from the switchboard should 6M boiler above. Secondly, if your boiler is electric steam boilers, the installation should pay attention to the ground as it relates to the use of safety later. In order to secure the ground wire installation, a ground line nearby and piling a depth greater than or equal to 1 m 5, the cable connector ground should be sintered at a ground pile head. Moisture to prevent rust should be higher than the ground connecting linker 100mm is appropriate. Boiler exhaust chimney to be discharged toward the outside should be, and should be higher than at the outlet of the boiler Di from 1.5 to 2 m. Ask your local branch overhaul of special equipment installed after the declaration. Acceptance by the relevant part of the consent to the use, and receive a use permit before using the boiler. 30L or less than the vapor pressure of the wns horizontal 3 ton steam generator volume is less than 0.1MPa fall within the scope of the national exemption, ie no need for boiler use permits can be used. According to fast boiler for you to order a steam boiler installation steps, I believe you'll succeed in steam boilers will be installed successfully!