3 ton oil boiler for sale
Fire fighting methods inventory 3 ton boiler for sale in the boiler use, if a fire phenomenon, you know how to deal with it? Today, Xiao Bian teach you the recipe. When coal is poor or low load, it may be administered less number, to maintain a high pulverized coal concentration, but can not chipping operation or asymmetric operation. Load is less than 170MW, should remain A, B powder layer to stable operation, when any failure to a powder, should be administered stable combustion, the failure to the powder to be put into operation, combustion stability, and then exit the gun run . Adjustment of the amount of the low-load air supply, to maintain the oxygen 4-5%, and adjust the opening degree of the auxiliary windshield. If it is a bad case of fire, may be appropriate to increase the primary air temperature, wind speed reduces time, but not overshoot the spark plugs burned once or blocked ducts. When the job should be strictly periodic system and to reduce powder powder switching system, dust bunker normal position at least 2.5 meters, so that a stable working state bunker, at each adjusting shutter powder to powder, the powder as far as possible amount consistent and stable, no spark plugs to prevent dust and to dust gravity caused by combustion fluctuations. Should maintain acceptable fineness of pulverized coal, according to chemical analysis, after adjusting the test plate to open Classifier, coal is poor or low load, it may be appropriate to increase the fineness of pulverized coal, in order to facilitate combustion. Maintain normal milling system, powder separator shall not clogging the tertiary air pinkish large deterioration in combustion. Furnace can eliminate air leakage and air leakage milling system, all view of the fire without plugging holes, play Giocondo, etc. should be tightly closed. Value of the long should keep abreast of the situation of coal and coal quality fuel, combustion instability occurs when, such as when a fault powder, coal mutation, the differential signal changes drum is too large, the oil should immediately cast coal combustion stability and taking samples for analysis. High load, the premise of ensuring steam temperature, combustion can be appropriately adjusted to prevent the shift of the center of the flame, so that the furnace exit gas temperature rise, caused by coking. Operator adjusting the main steam temperature may be employed with positive pagoda wind run, the central flame stabilizer. Should be a bellows pressure control as a basis for wind speed, in time to observe the duct pressure and temperature, the premise of ensuring primary air duct is not blocked, a bellows pressure should not exceed 4000Pa.
Burner and flue installation and electrical installation and the fuel supply system of the burner 1, burner 1) before installation read "burner manual", according to the installation requirements. 2) Burner mounting flange, the middle requirements, to ensure the burner to the 3 ton boiler for sale flue gas does not leak at the interface. 2, the installation of fuel supply system (see schematic) Note: To prevent a fire caused by generation of static electricity in the fuel tank, the tank should have a good grounding. 1) supply system tank top tank top-feed system suction recommended distance between the back plane and the tubing inside diameter of the oil pump axis, the total length of the suction pipe Hm, m, no greater than DL6-34DL40-75DL100-250Di = 10mmDi = 14mmDi = 16mm0.51.03030401.535452.03535452.540503.0404050 Notes: (1) when there is an elbow or valve on the suction pipe, each of the length of the suction pipe to be minus 0.25m. (2) Di recommended internal diameter suction pipe and return pipe. 2) the distance between the bottom of the tank bottom of the tank supply system supply system pipe inner diameter recommended oil pump axis and a plane, the total length of the suction pipe Hm, m, no greater than DL6-34DL40-75DL100-250Di = 10mmDi = 14mmDi = 16mm1.03030401.535452.03535452.540503.04040504.045 Notes: (1) when there is an elbow or valve on the suction pipe, each of the length of the suction pipe to be minus 0.25m. (2) Di recommended internal diameter suction pipe and return pipe. 3, gas pipe installation requirements Burner gas line itself has been connected, the intake port, the intake pipe bends should be minimized and good sealing performance requirements, to prevent leakage. (Iv) a chimney installation, to prevent leakage, the leakage of smoke, to prevent smoke inhalation chamber. 2, a vertical mounting, a right angle bend bends should be avoided. 3, the top of the chimney must be water-resistant measures. (E) mounting a power switch with electrical connection box 1, the power switch should be considered easy to operate, away from heat, fixation, meet the design requirements. 2, the use of 220V (380V), 50HZ power source, and a ground line. 3, voltage instability in the region use, should be safe regulators. Or affect the normal operation of the combustion engine. 4, the power cord to the electrical box must be connected in strict accordance with the requirements, otherwise, there will be dangerous!
Gas oil furnace fuel additive effect and the 3 ton boiler for sale room Notes: Gas oil furnace, oil furnace that is both in one, and, still in the boiler in this category, so, based on this, the following will continue be familiar with and understand the boiler, because it is the product website and keywords. Moreover, we can also derive some new knowledge, in turn, make progress and development in their learning path. 1. Gas oil furnace, which is a fuel additive, then what good? Gas conducting oil furnace, in which fuel additives, it is possible to optimize the fuel, and reducing soot and improving thermal efficiency. However, it should be noted that, in addition amount to control the well, in moderation, too much or too little, will always have problems, thereby, affecting the normal combustion of the fuel. 2. Gas-fired steam boiler and gas oil furnace, boiler room can both jointly built it? Gas-fired steam boiler and gas oil furnace, two boiler room, is jointly built, and that is no problem. However, it should be carried out in accordance with the steam boiler room equipment specifications and oil furnace room design specifications, avoid mistakes, and at the same time, to make the two boilers, a good use of effects.
Oriental Hawaii Holiday Hotel is located in Xiaogan City of Hubei Province in accordance with international five-star hotel standard design, set business rooms, SPA bath, foot care, indoor spa and other facilities in one of the hotel. Hot water 3 ton boiler for sale is one of the important facilities normal operation can not be separated. With the pace of Hubei Province in response to the national defense of the blue sky, the use of clean fuels gradually increase the proportion of Oriental Hawaii hotel provides visitors to the more perfect leisure experience a sense of the original wishing more polluted coal-fired boilers to replace clean and green gas-fired boiler. After comparing several vendors boiler industry, a number of R & D results very fast square value in the field of clean fuels, entered into a collaboration with the fast boiler. Fast boiler integrally provided a 1.4MW condensing pressure hot water boiler (CWNSL1.4-95 / 70-Y.Q) according to their actual needs. Put into use, fully meet the needs of Oriental Hawaii Holiday Hotel heating and hot water supply.