6Kw 220V Steam Generator
9.Steam from the steam drum is sent to the primary super-heater.
10.Steam is super heated to a high temperature and pressure in the primary super-heaters and then moves to the secondary super-heaters.
11.In the secondary super-heaters steam meets the very hot gases exiting the top of the boiler. The steam is heated to its final temperature and pressure before leaving the boiler as main steam. The main steam is sent to the high pressure steam turbine. The steam turbines drive a generator which produces electricity.
12.Steam exiting the high pressure steam turbine is called cold reheat. It is reheated in the re-heater and sent back to the second steam turbine. By the time the flue gas exits the boiler most of the energy in the coal will be transferred to the water in the boiler. The hot gases are cleaned up before they are sent to a stack. Feed-water is generally supplied by condensed steam from the low pressure steam turbine. Large amounts of cooling water are used to condense this steam into liquid water in the condenser.
Battle blue horn sounded, emissions of sulfur, nitrogen and oxygen compounds gradually strict national requirements. To improve the quality of the environment, but also the people a blue sky, in all industries around the environmentally friendly product revolution, Hainan Sinochem Pharmaceutical companies are no exception. By the company investigation and comparison of boiler products, in March 2017 signed a six-ton steam-cleaning integrated condensing gas boiler and steam fast boiler. Tested and post feedback, the boiler equipment installation qualification, operating normally, and successfully passed the inspection by local quality inspection departments of the boiler.
Hot water boiler with a larger proportion of load capacity, the stronger will be the hot water boiler system in Henan fast boiler, hot water boiler according to each stage of each master regulator proportion with the size of the load changes required. Hot oil boiler subsystem selection and adjustment of the thermal efficiency Turbo - Cascade adjustment system Report - hydraulic adjustment system with similar frequency feedforward. Selection of the proportion of the primary regulator regulator, the thermal efficiency of turbine generator with - a frequency adjustment hydraulic system should depend on the frequency difference amplifier, which is equal to the proportion with the rate varying turbogenerator, hot water boiler with a size expressed potential load size, with the larger proportion, the more stronger potential hot water boiler with a load; accounting for selection of the sub-regulator integral regulator, and the thermal efficiency of turbine generator - thermal efficiency of the hydraulic adjustment system frequency regulator should depend ; the amount of oil introduced into the report signal, and the thermal efficiency Turbine - Turbine introducing frequency adjustment hydraulic system pressure signal dependent on the first stage should be, their effectiveness is rapidly cleared amount of hot water boiler fuel spontaneous disturbance.
What needs to pay attention to low-carbon transformation of the boiler there? Compared to ordinary low-carbon boiler boiler, it is much more environmentally friendly, so I chose to use a low-carbon economy to be more environmentally friendly boiler, then, to use the technical transformation of the boiler low-carbon, low-carbon transformation that the boiler when what ? attention to the needs of today it Yuyao Kai large 6kw 220v steam generator boiler manufacturers are concerned that low-nitrogen transformation of those things: 1 gas burner ignition fails the second consecutive time, should stop to check the gas supply system, the burner has occurred normal circuit wiring is correct, after the lifting of the fault before restarting the burner. 2. The supply line is prohibited or metal rod with a wrench percussion, friction, to avoid static electricity or sparks, causing a gas explosion. 3. In the non-gas manifold or pipe smoking, etc. flange, welding, cutting and other illegal operations. 4. prohibited any open flame test next to the pipeline and valve block and pressure regulator, to avoid a major accident. 5. In the gas supply line, is carried out evacuation, but the residual wall gas or liquid droplets, in case, electrostatic sparks and flame also cause fire and explosion. 6. When the air supply has the same period, and when disassembling valve failure, it shall be first distal manifold valve, then the valve to the manifold to the total length of tubing in which the gas is vented before it can be disassembled with the valve service. 7. prohibit the use of non-explosion-proof electrical power tools in the field. Leak valve 8. A device must be checked before use. 9. Before burner start, the supply pressure testing must be done to check for leaks, after confirming normal, then a simulation run. 10. When the burner is not used to inform the customer off power supply main valve and the main switch. 11. Not recommended for debugging night burning machine. 12. At the end of commissioning, to organize training of operating personnel to use the operating direction, establish operating procedures, if necessary. These are some of the issues of low-carbon transformation of the boiler should be noted that, in order to prevent danger, should strictly follow the precautions execution, where the checks have checks in place, there can be no negligence, to complete the renovation project of low-carbon boiler.