factory price boiler
2, Kai hot water factory price boiler furnace operation
When Kai furnace again, should open the circulating pump, the water in the system to achieve the normal cycle, open the induced draft fan, blower, start the grate and the coal system, gradually recovered coal combustion. When the shutdown longer required pressure furnace, combustion should preferably seam, after clearing slag, then covered with a thick coal seam fire pressure.
Anyang City Minshan Nonferrous Metal Co., Ltd. is a collection of urban mining, renewable resources, energy as one of the economic wisdom of cleaning companies, mainly non-ferrous metal extraction and processing work. Company to conserve energy, cleaner production for the purpose of this concept coincides with the fast factory price boiler. Thus, when the company in the purchase of the product boiler, and fast boiler almost hit it off, by the party to provide a fast 6 tons of steam integrally condensing gas steam boiler (WNS6-1.25.Y.Q).
Hot water factory price boiler does not use softened water, what harm? Hot water boiler does not use softened water, what harm? Boiler during operation of the water quality requirements are more stringent, thus making boiler feed water, will install water softening water treatment device, then, if not soften water What harm would it deal with? 1. waste fuel because the water is not timely treatment, over time, the water content of non-compliance with the boilers physical or chemical reaction, can cause damage to the boiler wall or boiler scaling, affecting boiler the thermal insulation effect and efficiency, and that, in order to ensure that this part of the loss, the amount of the fuel will increase with. 2. there will be corrosion. Since the acid-base substance and oxygen present in the water with the metal body of the boiler should chemical method, so that the furnace wall is gradually reduced, dents, reducing the strength of the boiler, can easily cause accidents operation. Of course there will be other hazards, such as boiler output, normal boiler water cycle, boiler shortened life expectancy and so on. These are the dangers of not using soft water changes caused. After analysis of the dangers of not boiler water softening treatment, you will find, if you want, such as the boiler low-power high efficiency, high operational safety, water softening boiler also make one of the most important factors, therefore, strictly according to the standard treatment also needs to be carefully done.
Boiler installation project quality manager duties 1) is responsible for the implementation of the installation of technical standards and quality system documentation factory price boiler works undertaken; 2) is responsible for organizing the preparation of construction design, construction program and other technical documents; 3) the quality of the project's records meet the requirements responsible; work 4) led project professional responsibility of personnel, coordination and collaboration among each other for the right to dispose of controversial issues and quality assurance engineer or quality management representative report; 5) implementation and product quality and boiler-related regulations, norms and standards; 6) the work of running the organization project boiler installation quality system, to coordinate the project quality system of the relevant functional departments and professional responsibilities of personnel; 7) in accordance with the contract requirements, project characteristics, determine the work quality objectives and requirements; 8) to master the engineering quality information, timely feedback to the relevant engineers professional liability, continuous improvement to ensure project quality.