Industry Coal Steam Boiler For Chemical Plant
About six tons of industry coal steam boiler for chemical plant shutdown of a temporary shutdown: It is planned, therefore slow cooling during shutdown protection device, it should also pay attention to safety, pause furnace according to the rules in Chapter IV Fenghuo (pressure fire) get on. 2, safety shutdown: care should be completely stopped even on normal operation plan for 1 to 3 months to be a shutdown, shutdown should maintain more safety injection apparatus, after the shutdown, and other water-cooled furnace to below 70 ℃ when they let go of the gas, open manholes, hand holes, rinse the pot with water scale. 3, emergency shutdown: the boiler operation, when the case of the following circumstances, should an emergency shutdown, and notify the relevant authorities. (1) expanding the cease-fire should first see if the water table level is called to take water law. If Inception water table, water cock side, and then close the steam cock, and then turn on the water faucet open and close repeatedly called after water, still can not see the water. (2) All water supply equipment failure. (3) All water gauge, pressure gauge, safety one of all the failures. (4) a boiler or furnace wall element damage, serious threat to the safe operation of the boiler, emergency shutdown, should focus on preventing the stop of the accident and the specific steps as follows: ① first blowing off; ② the coal on the grate red raking; ③ Close induced draft fan.
Our other fast boiler in the boiler industry strength already heard, through cooperation proves that our choice is correct. This water-tube boilers installed very quickly, basically no delay our production process, bring benefits to the enterprise. --customer feedback
Fuel oil combustion process differs from the process industry Industrial Combustion fuel oil-fired boilers for industrial oil fired boilers and industrial boilers, having a certain temperature and pressure injected into the furnace through the nozzle is atomized into fine droplets, and then absorbs heat in the furnace, vertical oil-fired boiler, surface gradually vaporized into oil, mixed with intake air in the furnace, form a combustible mixture. The combustible mixture continues endotherm temperature reached ignition ignition combustion. Fuel amount, air amount and the amount of the composite has a one to one relationship of steam, it is necessary according to the load amount of steam required to control the amount of fuel and air supply, but also by the wind furnace pressure control apparatus. Different oil-fired boiler with a different point of industrial coal-fired boilers point of industrial boiler fuel industry and industrial coal-fired boilers. PM2.5 pollution damage to the environment led some coal-fired boilers industrial boilers is facing new boiler renovation or change of situation, which makes oil-fired boiler to become the darling of the market. Oil-fired boiler with a coal-fired boiler in comparison with structurally quite different purposes, as follows: (1) injecting fuel into the boiler furnace through the burner, combustion chamber without using fire grate facilities; (2) Since the oil, gas did not produce combustion ash, it is no oil or gas boiler slag and slag outlet device; (3) injecting a gas or oil furnace materialized, if mixed with air or flame within a certain range, is easy to form an explosive gas, Thus fuel (gas) required automated combustion boiler system, comprising a flame monitoring, flame protection, explosion-proof safety; (4) Since the oil, gas calorific value is much larger than the calorific value of coal, so the thermal strength than fired furnace high multi-furnace, so relatively small and the capacity of the boiler with coal-fired boilers, compact, small footprint; combustion process (5) fuel (gas) is suspended in a boiler furnace, the furnace is provided so its before and after the arch, the furnace structure is very simple. Meter manufacturing, Supervision, Inspection and the main characteristics of biomass fuel boilers [] protection devices and control systems introduced a biomass fired boiler biomass fuel boilers are in strict accordance with "Steam Boiler Safety Supervision", JB / T10094-2002 "general industrial boilers technical conditions ", JB / T1619-2002" shell boiler body manufacturing technology, "execution, ensure long-term security and stability of the boilers. Body is a shell type three return all wet back downstream pyrotechnic pipe structure, large combustion flame in the combustion chamber a slight positive pressure, stretched stretch, combustion heat load is low, less NOx emissions of harmful substances. Waveform furnace and threaded pipe structure that improves the strength, but also to meet the needs of each portion of the thermal expansion. Master butt welds are connected, and by X-ray and ultrasonic nondestructive testing, to ensure the welding quality to meet national requirements. Boiler water volume and large air space, adaptable load capacity. Design reasonable pot, with water vapor to ensure that less than 4%, to meet user requirements for higher quality steam. Using the new insulation materials, light weight, low heat loss, good insulation properties. Water level alarm stainless steel rods as electrodes, an insulating material as polytetrafluoroethylene. Inserted from above, linked to pollution easy, reliable, and long service life. Before and after the smoke box is hinged, can easily open, repair and maintenance quick and easy maintenance. Adjusting the oxygen content (optional): The system can successfully monitor the oxygen content in the flue gas, and transfer the data to the real-time control systems, intelligent analysis by a computer, the automatic adjustment device stoichiometric combustion, it is in real-time good working shape, combustion efficiency is greatly improved, which can significantly reduce fuel consumption. Biomass fuel boiler operation timing of the protection device, the operation of the control system by the timer, the system automatically enters the work or off duty. The control system may be provided multiple sets of the timing period within 24 hours. Any period of time in a group of a plurality of sets of timing of the current time period, the system enters the working state. Work within the timing period, the status screen is displayed automatically. In the period of time in commuting to work outside the state. Each group comprises a turn-on time period (hour, minutes) and a closing time (hours, minutes) may be set or modified when the three control period, divided by the setting operation and the current time. The user can set different time different temperature ranges.
6 tons gas industry coal steam boiler for chemical plant steam pressure adjusting a boiler operation, must frequently monitor the pressure gauge indicated. To maintain stable steam pressure, boiler pressure must not exceed the design pressure. Second, increasing boiler load: Steam pressure decreased boiler load is increased, if the level is high at this time, the amount of water should be reduced to a water supply or suspend, the amount of coal and increase the air volume. Gradually increase the amount of water at the same time to strengthen the burning, keep the steam pressure and the water level is normal. Third, the boiler load reduction: the vapor pressure rises to reduce boiler load, if the level is high at this time, the amount of coal should be reduced and the air volume, reduced combustion. Then the appropriate water reduction or suspension of water supply to the water vapor pressure and stability in the nominal range. Then press the normal combustion and the amount of feed water 8 to adjust. If the actual water level within the boiler is low, to increase the amount of water should, until the water level returns to normal after the combustion and needs to be adjusted according to the water vapor pressure and load changes.