7mw oil central heating boiler
Burner output should match the rated output of the 7mw central heating boiler, choose a good shape of the flame, such as length and diameter so as to adapt the furnace structure. The required combustion air is supplied from the root flare fuel gas and air or oil mist uniformly mixed rapidly, to ensure complete combustion.
Fire fighting methods inventory 7mw central heating boiler in the boiler use, if a fire phenomenon, you know how to deal with it? Today, Xiao Bian teach you the recipe. When coal is poor or low load, it may be administered less number, to maintain a high pulverized coal concentration, but can not chipping operation or asymmetric operation. Load is less than 170MW, should remain A, B powder layer to stable operation, when any failure to a powder, should be administered stable combustion, the failure to the powder to be put into operation, combustion stability, and then exit the gun run . Adjustment of the amount of the low-load air supply, to maintain the oxygen 4-5%, and adjust the opening degree of the auxiliary windshield. If it is a bad case of fire, may be appropriate to increase the primary air temperature, wind speed reduces time, but not overshoot the spark plugs burned once or blocked ducts. When the job should be strictly periodic system and to reduce powder powder switching system, dust bunker normal position at least 2.5 meters, so that a stable working state bunker, at each adjusting shutter powder to powder, the powder as far as possible amount consistent and stable, no spark plugs to prevent dust and to dust gravity caused by combustion fluctuations. Should maintain acceptable fineness of pulverized coal, according to chemical analysis, after adjusting the test plate to open Classifier, coal is poor or low load, it may be appropriate to increase the fineness of pulverized coal, in order to facilitate combustion. Maintain normal milling system, powder separator shall not clogging the tertiary air pinkish large deterioration in combustion. Furnace can eliminate air leakage and air leakage milling system, all view of the fire without plugging holes, play Giocondo, etc. should be tightly closed. Value of the long should keep abreast of the situation of coal and coal quality fuel, combustion instability occurs when, such as when a fault powder, coal mutation, the differential signal changes drum is too large, the oil should immediately cast coal combustion stability and taking samples for analysis. High load, the premise of ensuring steam temperature, combustion can be appropriately adjusted to prevent the shift of the center of the flame, so that the furnace exit gas temperature rise, caused by coking. Operator adjusting the main steam temperature may be employed with positive pagoda wind run, the central flame stabilizer. Should be a bellows pressure control as a basis for wind speed, in time to observe the duct pressure and temperature, the premise of ensuring primary air duct is not blocked, a bellows pressure should not exceed 4000Pa.
The purchase of gas-fired 7mw central heating boiler, we are more anxious shopping center, but for gas-fired boilers are not very understanding. After the introduction of others, we understand each other fast boiler more comprehensive, and more trust fast boiler. After the boiler put into use, it turns out, party fast products fully meet the needs of our shopping centers. --customer feedback
In June 2015, a textile plant in Odessa, Ukraine visited our factory. Before this, we have contacted with each other about 10 ton steam 7mw central heating boiler. Our senior sales manager Summer introduced our WNS natural gas boilers and achievements, history about our ZG Boiler. ZG Boiler has got international certifications such as GOST, ASME, IBR, etc. Each year, there will be sets of industrial boilers exported to Russia, India, Pakistan, America, Japan, England, etc. We have rich experience in industrial boilers manufacturing such as natural gas fired boiler, oil fired boiler, biomass fired boiler, coal fired boiler, cfb boiler, waste heat recovery boiler, etc. Our advanced engineers team can give you pesonal tailor on your industrial requirements. Saving money and energy is our pursue in boiler designs. Our industrial gas fired steam boiler has long life service and good quality. Its horizontal structure in design makes it convenient to transport and install. And our natural gas fired steam boiler with automatic operation system, is safe and benefit to the boiler operator.